-
Project Management
-
Process Layout
-
Process Mapping
-
Design Specification
-
Business Case
-
Help & Support
-
Budgeting
-
Documentation to Support Funding
-
Equipment Procurement
-
Trials & Reports
-
2D & 3D CAD
Optical Sorter & Associated Buildings for Maincrop Onions
Feasibility to handover
The solution offered the client unparalleled technology to identify internal defects and significantly reduce wastage. Evidence based trials to validate performance claims and working closely with original equipment manufactures to deliver in a bespoke solution in time on budget. Resulting in Industry leading performance and capability.
Agricultural Anaerobic CHP Plant - Renewables
Feasibility To Handover
Delivering a 500Kw combined heat and power plant using agricultural feedstock to include connection to the national grid. This involved design, procurement and project management. On time, in budget.
Low Care Processing Facility
Feasibility to handover
Designing and constructing a low care processing facility to allow the client to enter into the processing market. This involved converting an existing building and relocating
processing equipment over a 72hr window to provide seamless continuity.
Automated Onion Grading & Packing Facility
Increased efficiency & Automation
This solution focussed on efficiency and capacity allowing the client to operate at a lower cost to secure 100% customer contract. All operations were aligned within a tight footprint to provide a fork lift free packing area with automatic index fill and end of line packing.
Specialist Cold-Storage for Brassicas
Design & Build
Developed to provide a pioneering solution for brassica storage
using high humidity low air flow technology. This enabled the client to extend the UK supply season and mitigate crop flush wastage..
20,000 tonne Grain Storage
refurbishement
Upgrading building fabric and ventilation to improve quality and safeguard future business.